Thorne Group Technologies Limited


Thorne Pneumatic Systems Limited


Pneutrans Systems Limited


Gero Technologies Limited

Pneumatic Capsule Pipeline

Process

  • To transport coal, ore, aggregate, garbage, fertilizer, concentrates and tailings in large quantities over long distances
  • Capsules connected into trains, transport product 250,000 tons, on up, for a distance from one mile (2 Km) to tens of miles, horizontally, inclines and vertically.

Applications

  • Open pits
  • Underground mines

Features

  • Two or more different products can be easily transported simultaneously in the same or opposite direction
  • Multiple entrances and exits from the system

Benefits

  • 5 years operation cost is $0.15 to $0.20 per tonne kilometer
  • After 5 years, operation cost is $0.05 to $0.08 per tonne kilometer. (system is paid for)
  • From work face to point of use in Mill/Cleaning Plant elimination of up to 6 material handling systems plus 3+ expensive transports

 

 
Pneutrans Systems Limited
P.O. Box 163, Aurora, ON, Canada L4G 3H3 • 905.727.3408
Site built and maintained by hypertext.ca